Permit precheck

Stop permit delays
before they start.

PermitOS helps teams precheck permit packets, surface missing items, organize corrections, and submit with more confidence — before review begins.

Start precheck
Permit packet workspace with readiness score, issue list, document status table, and a building site plan with a highlighted setback conflict.
Workflow

From upload to ready to submit.

  1. Upload packet

  2. Detect missing items

  3. Flag zoning & document issues

  4. Organize corrections

  5. Produce reviewer-ready brief

  6. Keep humans in control

Packet journey

From a messy stack to a reviewer-ready brief.

The same packet, five honest moments — each one moves the work closer to submission.

An open manila folder with rolled architectural drawings and printed forms on a wood desk.Step 01

§Upload packet

Drop in everything you have.

Plans, application forms, supporting documents — PermitOS opens the packet and indexes what's inside.

Packet contents

4 files
  • Site plan — A1.pdfIndexed
  • Architectural set — A2-A7.pdfIndexed
  • Application form.pdfIndexed
  • Owner authorization.pdfIndexed
A printed correction notice with line items circled in red and highlighted in yellow.Step 02

§Detect missing items

See what reviewers will flag first.

PermitOS compares the packet against the checklist for this permit type and surfaces the gaps before submission.

Items reviewers commonly flag

4 found
  • Energy compliance formblocker
  • Structural calculations — wind loadblocker
  • Owner-contractor agreementwarning
  • Existing conditions photoswarning
Zoning compliance clipboard on a blueprint with a teal-tabbed checklist and a scale ruler.Step 03

§Flag zoning & document issues

Check setbacks, scope, and code references.

Zoning rules, site plan callouts, and required references get checked against the property and project type.

Zoning checks

R-2 · Single family
  • Front setback
    20'
  • Side setback
    5'
  • Rear setback
    8'
  • Lot coverage
    38%
  • Building height
    31'
A before-and-after view of an architectural elevation: marked up with red corrections on the left, clean and rolled with a teal band on the right.Step 04

§Organize corrections

Turn comments into a clear punch list.

Review notes become assignable corrections with clean before/after status — so the team knows what to fix and what's already done.

Corrections

3 / 4 resolved
  • Update rear setback to 10'
  • Reduce ridge height to 30'
  • Add wind-load structural calcs
  • Attach revised elevation sheet A-3
A bound permit brief with a clean cover sheet resting on a folded plan set.Step 05

§Reviewer-ready brief

Submit a packet a reviewer can actually use.

A clean cover, an index, the resolved issue trail, and the final plan set — packaged so the review team can start working immediately.

Reviewer brief

Ready to submit
  • Cover sheet · project + applicant
  • Index · documents and sheets
  • Resolved issue trail
  • Final plan set, ready to submit
Packet readiness desk

One workspace where the packet gets ready.

Documents, checklists, zoning context, and corrections live in one place — so the team can see exactly what's left before the packet is ready to submit.

Readiness score

Live

87 / 100

  • Required documents12 / 12
  • Zoning checks2 to confirm
  • Open corrections1 remaining
  • Reviewer brief assembledYes
Pricing

Practical pricing that matches how you work.

Start with one precheck, scale to a full workspace when you're ready.

Applicant lane

Precheck Starter

Homeowners, small contractors, and one-off applicants

$49per precheck

  • 1 permit package precheck
  • Project setup
  • Document checklist
  • Missing document review
  • Basic form mismatch flags
Start precheck

Firm lane

Firm

Architects, contractors, permit expediters, and small developers

$299per month

  • Team workspace
  • Multiple projects
  • Permit Precheck
  • Document inventory
  • Correction Fix Guide
Start workspace

Firm lane · High volume

Growth

High-volume permit expediters, developers, and multi-location contractors

$899per month

  • Higher project volume
  • Multi-jurisdiction organization
  • Advanced correction workflows
  • Review packet export
  • Shared project comments
Talk to sales

City lane

City Pilot

Municipal permitting departments and city teams

Customper pilot

  • Reviewer Workspace
  • Correction Letter Generator
  • Intake precheck workflows
  • Department routing notes
  • Reviewer confirmation states
Talk to sales

Need something different? Compare plans or talk to sales.

Customer voices

What teams say about the workflow.

PermitOS helped us catch missing sheets and unclear notes before the packet went back to the city. It does not replace our review, but it gives the team a cleaner starting point.

Operations lead, residential design firm

The biggest help is the correction list. Instead of hunting through comments and emails, we can see what needs to be fixed, who owns it, and what is ready to resubmit.

Project coordinator, general contractor

For smaller projects, the precheck keeps applicants from submitting half-ready packets. Our reviewers still make the decisions, but the intake conversation starts cleaner.

Permit intake manager, municipal review team

Clean up the packet before it enters review.

Run a precheck, find the gaps, and submit with more confidence.